Plug-in SolarEast Midlands

Plug-in solar panels supplied and fitted across the East Midlands, county by county.

From Nottingham to Lincoln, we arrange the panel, the fitting and the paperwork. Our county guide says where a panel usually goes on the houses round here. Send a postcode and we'll do the rest of the checking.

  • The rules get checked before you get a price
  • Manufacturers don't pay us
  • Not suitable? We'll say so up front

Your house, in a few boxes

Postcode, email, your name, and where on the house the panel would go. We come back by email with what's allowed there and what it'd make in a year.

We email you back. Nothing is passed on and we take no commission from anyone.

A terrace of golden ironstone cottages with dormer windows at Husbands Bosworth in Leicestershire

Ironstone cottages at Husbands Bosworth, Leicestershire. Ironstone runs up through Northamptonshire and Rutland into the south of Leicestershire, and it is one of five wall materials we see most.

County by county: where a panel usually goes

We work across the whole region. The guide goes through each county in turn and says what its houses are usually built from.

  • Nottinghamshire

    Red brick terraces in the city and brick estates around it. Most homes here have a brick wall or a tiled pitch that will take a fixing.

  • Derbyshire

    Limestone and gritstone in the dales, brick in the towns. Stone takes a fixing well, but a lot of the county sits inside a conservation area.

  • Leicestershire

    Brick terraces in Leicester, and ironstone villages towards the south of the county where the ironstone belt begins.

  • Lincolnshire

    Limestone in the west of the county, brick and pantile across the rest. Gardens here are often long, and a frame on open ground is the easiest option to get right.

  • Northamptonshire

    Ironstone villages, and a good deal of thatch. Thatch and timber both need looking at before anything is fixed to them.

  • Rutland

    Ironstone and limestone cottages. Many are listed or sit in a conservation area, so the surface check matters more here than almost anywhere in the region.

A row of red brick cottages with dormer windows on the main street at Wilson in Leicestershire
Brick cottages on Main Street, Wilson, Leicestershire.
Read the county guide

Timber balconies and cladding were left out when the planning rules changed

The planning rules changed on 27 August 2026 and the new version names plug-in solar directly.

27 August 2026 brought a new version of the permitted development right that covers solar equipment. Under it, a plug-in panel fixed to a wooden wall, to a balcony or to timber cladding is not covered. That exclusion is written into the guidance for houses and then repeated for blocks of flats.

There is a transition until 27 August 2027. Up to that date you may work to the older wording or to the new one.

A home outside the right needs planning permission instead. The government's own assessment expects the fee and the paperwork to weigh heavily against what a panel costs. That is why the surface comes first in our order of work.

Source: Planning Portal, solar equipment on a house or a block of flats. Read 13 September 2026.

A white rendered cottage under a thatched roof with a thatched porch at Coton in Northamptonshire
Spinney Cottage, Coton, Northamptonshire. The porch, the barge boards and the roof here are all timber or thatch, and none of them is a surface the new rules will let you fix a panel to.

What a panel generates in the East Midlands, by position

Four places you could put one 800 watt device at the same address in Nottingham, and what each one would make in a year.

  • A south facing roof pitch at 35 degrees760 kWh
  • A frame on open ground at 30 degrees754 kWh
  • A south facing wall, upright564 kWh
  • An east facing wall, upright391 kWh

A frame on open ground comes within about one per cent of the roof pitch. That matters here, because a frame in the garden is also the option the new balcony rule leaves alone.

Generation modelled with PVGIS for 0.8 kWp at 14 per cent system losses, unshaded, at one point in Nottingham. Queried 13 September 2026. A region is not a point, and shade from a tree or a chimney is not in these numbers.

A limestone rubble wall under a red pantile roof with a street sign and a post box, at Carlton Scroop in Lincolnshire
Limestone and pantile on Charity Street, Carlton Scroop, Lincolnshire. A curved pantile and an upright wall are two different fixings and two very different figures.

National Grid Electricity Distribution needs a form once it's installed

You are asked to tell your network operator within 28 days of installing the device.

A brick farmhouse with sash windows and a red front door, half covered in ivy, on a lane in Lincolnshire
Elm Tree Farmhouse at Eastoft, Lincolnshire.

The whole of the East Midlands sits in one licence area, and the company named on that licence is National Grid Electricity Distribution (East Midlands) plc. Treat that as our working answer and check it on the operator's postcode tool before you send anything in.

Dialling 105 does the same job. It costs nothing, it answers from anywhere in England, Scotland and Wales, and it connects you to the company responsible for the cables feeding your street.

The form asks for your name, your email address and the address the device went in at. It takes a few minutes and we sit with you while you send it.

  • Nottinghamshire
  • Derbyshire
  • Leicestershire
  • Lincolnshire
  • Northamptonshire
  • Rutland

Questions people ask

Will I need planning permission?

Most homes will not, although the right comes with conditions rather than working automatically. A plug-in panel leans on the same permitted development right as any small solar installation, and that right sets limits on projection, on conservation areas, on listed buildings and, since August, on wooden surfaces. A home that falls outside it needs an application. We work out which of the two describes your home before any money is spent.

How many panels are allowed?

One device for the whole home. The product specification itself permits a device on each final ring circuit, then hands the question over to the network rules, and those rules cap it at a single device per household. The cap sits in Engineering Recommendation G98 Issue 2 Amendment 1 and holds until that document is amended.

Can I add storage to it?

Not within the approved class. When the interim product specification was written, batteries were left outside it, whether sold on their own or built into the device. A bundle that arrives with storage attached therefore sits outside what August approved.

Can I check a kit before I buy it?

Yes, on the register. Before a device goes on sale the manufacturer has to type test it under G98, list it on the ENA Type Test Register and receive confirmation that it passed assessment. A product missing from that register has been assessed by nobody, however the sales page reads.

Every question we get asked, answered in full

Limestone cottages and a village post office beside a road junction at Calver in Derbyshire

A postcode is all we need to start

We will tell you what the rules allow at your house, and we will tell you when the answer is that a panel will not work there.

Send a postcode