Within 28 days of the panel going in, the network operator wants a short form. We fill it in together.
The East Midlands is one licence area. The operator on record for it is National Grid Electricity Distribution (East Midlands) plc. Some older documents still call the same company Western Power Distribution, which was the name until 2022, so do not take that as a sign the answer is wrong.
Treat this as our working answer. Check it with the operator's own postcode tool first, because licence boundaries and county boundaries are not the same lines.

Dial 105. There is no charge, it answers from any postcode in England, Scotland and Wales, and it connects you to whichever company owns the cables in your street. That beats reading a map, and it is right everywhere.
It is a short online form and the government describes it as taking about five to ten minutes. You give your name, your email address and the address where the device was installed, within 28 days of installing it. The guidance that comes with a compliant device is meant to point you at it.
We sit with you while you send it, so nothing about it comes as a surprise later.
One device per final ring circuit is what the product specification permits, and it then points at the network rules on top of that. Those rules, in Engineering Recommendation G98 Issue 2 Amendment 1, hold a household to a single device, and that stands until the recommendation is amended. Ofgem signed the change off on 11 August 2026 and it took effect on 27 August with everything else.
The 28 day notification is described in the government's impact assessment as what a consumer is asked to do, so we word it that way rather than as a penalty. We would still send it. It is a few minutes and it keeps the record straight.
The notification described in the assessment goes to the distribution network operator, which is the company that owns the wires, not your supplier. They are different companies and the form is the operator's.
The notification is the same. What is different is consent: you may need your freeholder or the building management to agree first, and the wooden wall and balcony rule applies to blocks of flats as well as houses.
A postcode and the name of the material is enough for us to start.
Send a postcodeGive us the postcode and we'll go through it.
A postcode, plus the material your wall or roof is built from, is all we need to make a start. Back comes the rule that decides it at your address, with a yearly figure for the mounting you had in mind.
Postcode, email, your name, and where on the house the panel would go. We come back by email with what's allowed there and what it'd make in a year.
We email you back. Nothing is passed on and we take no commission from anyone.